Political parties vs. the Brazilian State, over the imposition of thermoelectric plants and setbacks in the energy transition

Location

DF Brazil

Status
In progress
Case file number
ADI 6932
Start date
July 15, 2021
Summary

The Direct Action of Unconstitutionality (ADI) was filed by the PSB, PSOL, Rede, PT, PDT, and PCdoB parties against Federal Law 14.182/2021, which authorizes the privatization of Eletrobras and modifies key elements of the legal framework governing the Brazilian electricity sector. The law resulted from the conversion of Provisional Measure (MP) 1.031/2021, issued by the Presidency of the Republic to facilitate the privatization of the company.

The lawsuit alleged the lack of the constitutional requirement of urgency for the drafting of the MP, which would have circumvented the ordinary legislative process. It also pointed out that, during the drafting process, the National Congress approved parliamentary amendments unrelated to the original purpose, profoundly altering the country's energy planning. Among these amendments, they highlighted the obligation to contract energy from Small Hydroelectric Plants (SHPs) and thermoelectric plants fueled by natural gas, even in regions lacking infrastructure for this fuel. They argue that these requirements impose a forced and inefficient redesign of the energy matrix, generating cost overruns, regulatory uncertainty, and a significant increase in greenhouse gas (GHG) emissions.

Another argument presented was that the law contradicts the climate commitments assumed by Brazil in the Paris Agreement, as well as the goals announced by the President of the Republic at the 2021 Climate Summit. In this regard, they asserted that the law represents a climate setback by blocking the decarbonization of the electricity sector and promoting fossil fuels, contrary to international recommendations. The legal action also challenges the authorization for the Federal Union to implement the Tucuruí transmission line, allowing construction to begin without the completion of the environmental permitting process and without prior, free, and informed consultation with the affected Indigenous communities, in violation of ILO Convention 169 and the Federal Constitution. The parties request: A precautionary measure to immediately suspend the effectiveness of Law 14.182/2021 or, alternatively, its most problematic articles.

The core issue was a request to declare the entire provisions unconstitutional, or alternatively, the specific provisions that mandate the contracting of small hydroelectric plants and thermoelectric plants, as well as the relaxation of socio-environmental controls. Given the importance of the matter, the President of the Supreme Federal Court (STF) determined that the abbreviated procedure would be applied, with the final decision to be made by the full court.

Climate element

The plaintiff parties argue that Law 14.182/2021, by mandating the contracting of Small Hydroelectric Plants (SHPs) and natural gas-fired thermoelectric plants, generates environmental and climate consequences incompatible with the national and international commitments assumed by Brazil. A primary argument is that this legislative obligation hinders the decarbonization of Brazil's electricity grid by increasing the use of fossil fuels in power generation.

The initial petition states that natural gas-fired power plants produce high greenhouse gas (GHG) emissions and increase the climate cost of the system, contradicting the emissions reduction targets set by Brazil itself under the Paris Agreement. It also points out that the law creates a “structural block” to the energy transition, as it forces the country to contract new thermoelectric capacity for decades, even in regions without gas pipelines, requiring significant investments in fossil fuel infrastructure. This redirection, according to the petition, represents an environmental and climate setback, violating the constitutional duty to protect the environment for present and future generations. The lawsuit also argues that the measures introduced by Congress lack technical support from the Ministry of Mines and Energy or the Energy Research Company. Technical documents cited show that the mandatory thermoelectric expansion will substantially increase emissions from the electricity sector, hindering compliance with Brazil's Nationally Determined Contribution (NDC). Another relevant climate issue is the authorization granted to the Union to implement the Tucuruí transmission line without completing the environmental licensing process or conducting prior consultation with affected Indigenous communities. According to the plaintiffs, this constitutes a violation of climate and territorial protection, since large-scale transmission projects have cumulative environmental impacts and require rigorous prior assessment.

Finally, the parties argue that the law violates the principle of non-regression in climate action, recognized by legal doctrine and applied in Supreme Federal Court (STF) decisions. They maintain that the Brazilian state has a positive legal obligation to reduce emissions, not to increase them through legislation that favors more carbon-intensive technologies.

Claimants
  • Brazilian Socialist Party (PSB)
  • Socialism and Liberty Party (PSOL)
  • Sustainability Network (Network)
  • Workers' Party (PT)
  • Democratic Labour Party (PDT)
  • Communist Party of Brazil (PCdoB)
Defendants
  • President of the Republic
  • National Congress
Territorial context

The ADI 6932 case identifies two distinct territorial areas as directly affected by Law 14.182/2021: the regions where the mandatory expansion of thermoelectric plants and small hydroelectric plants (SHPs) will be imposed, and the Indigenous territory linked to the construction of the Tucuruí transmission line in northern Brazil. In this regard, the case emphasizes that the law allows construction of the transmission line to begin without completing the environmental licensing process or the prior, free, and informed consultation required by ILO Convention 169. The line's route affects Indigenous communities located in the State of Roraima, whose lands are situated in areas of the Amazon rainforest characterized by high biodiversity and a close territorial relationship between Indigenous peoples and their environment. The Indigenous peoples mentioned in the case were already participating in administrative licensing and consultation procedures when the law authorized its suspension, which, according to the plaintiffs, jeopardizes both their territorial rights and the environmental integrity of the region. Furthermore, the lawsuit points to broader territorial impacts stemming from the mandatory expansion of natural gas-fired power plants in regions lacking existing infrastructure, which would require significant construction and additional territorial interventions. This implies effects on local communities, including vulnerable populations already facing infrastructure and public service deficits. Overall, the lawsuit argues that the law affects environmentally sensitive territories and communities—especially Indigenous communities—whose protection demands rigorous environmental assessment and respect for self-determination.

Rules and principles invoked

International agreements/treaties

  • Paris Agreement
  • ILO Convention 169

National laws

  • Federal Constitution of Brazil
  • Law 14.182/2021
  • Environmental licensing framework

Beginning

  • Principle of prevention
  • Principle of progressivity

This record was created using publicly available information. If you have information about this case or would like to suggest updates or corrections, please click here .

Links of interest
Instance
Constitutional
Actor type
Political parties
Topic
Acuerdo de París y compromisos climáticos
Coal
Dirty energy
Obligations of States
Environmental protection
Defendant type
State
Law / other regulations
Interim measures
Pending resolution
Grounds for claim
Paris Agreement and climate commitments
Local legislation
National legislation
Regional or international treaties